Assignment Name: Construction of Proposed ETP Shed & New Wastewater Sumps and New Cool & Hot Water Formation Sumps and Pasting Area Floor Renovation / Repair Works.
Location: Bugolobi
Client: Uganda Batteries Limited
Brief Description of Works Performed
Works included Design Review and Construction of the Proposed works in accordance to the drawings and Bills of Quantities.
Demolition Works, Excavation & Site preparation, setting out and transfer of measurements and level for the drawings to the site.
Foundation construction 230mm thick plinth wall on concrete blinding.
Construction of a framed structure using steel with load bearing walls from ground floor.
Roofing and cladding works using pre-painted roofing sheets IT4 Gauge 24.
Utility installation i.e. electrical works; Drainage works.
Finishes such as 25mm thick Plaster finish and painting works both internally and externally and Floor finishing using asphalt concrete surfacing.